| Availability: | |
|---|---|
260-9530
CAT
260-9530
Under the extreme conditions of mining and heavy construction, fluid power systems (such as cooling fans, torque converters, and water pumps) must endure massive rotational centrifugal forces as well as severe equipment vibration. The Impeller Hub, serving as the core bridge connecting the power source (shaft) and the working component (impeller/fan), directly determines the survival of the entire cooling or transmission system.
Designed specifically for mining drill rigs and heavy construction machinery, this product is manufactured from high-quality high-strength cast steel using precision casting and CNC machining. It ensures exceptional structural strength, impact resistance, and load-bearing capacity. As a key connection part between the power system and working mechanism, it guarantees the stable and reliable operation of the whole machine in various harsh environments with precise hole positions and perfect fitting accuracy.
High-Quality High-Strength Cast Steel: Unlike ordinary cast iron or welded parts, this product utilizes alloy cast steel materials such as ZG35CrMo or ZG42CrMo. These materials offer extremely high yield strength and impact toughness, enabling them to withstand the massive centrifugal force generated by the impeller during high-speed rotation (typically 1500-3000 RPM) and the alternating shear forces brought by equipment vibration on bumpy mining roads, preventing hub fracture or deformation.
Precision Casting: Using the resin sand precision casting process. This ensures the density of the hub's internal structure, eliminating microscopic defects like porosity and shrinkage. Furthermore, precision casting guarantees the flatness of the hub flange and the accuracy of mounting hole positions, requiring minimal secondary machining to meet assembly requirements and maximally preserving the original flow-line strength of the metal.
Precise Hole Positions & Fitting Accuracy: The hub bore (mating with the shaft) and end-face mounting holes (mating with the impeller) are processed via CNC precision boring, milling, and drilling. We strictly control the cylindricity and concentricity of the bore, ensuring an interference fit or transition fit between the hub and shaft, eliminating "inner ring spinning" or keyway wear caused by loose fits. Accurate bolt hole position ensures the static balance of the impeller post-installation.
Composite Surface Treatment:
Black Spray-Paint: Non-mating surfaces are coated with epoxy zinc-rich primer + polyurethane topcoat. This robust coating resists erosion from acidic mine water, mud, and chemicals, while preventing rust during storage and transport.
Oil Anti-Rust Protection: Precision-machined mating surfaces (bore, end face, keyway) are coated with specialized rust-preventative oil before leaving the factory. This oil film provides long-term protection prior to assembly and is compatible with lubricating oil, eliminating the need for cleaning and protecting against fretting wear.
Exceptional Load-Bearing Capacity: In hydraulic cooling systems of mining drill rigs or engine cooling fans, the hub must withstand massive axial tension and radial forces. The thickened flange design and reinforced rib structure ensure structural stability under long-term high-load operation, preventing deformation and vibration.
Fatigue & Vibration Resistance: Vibrations from frequent start-stop cycles and rough terrain are silent killers of hubs. The optimized stress distribution design effectively avoids stress concentration points, providing strong fatigue resistance and preventing crack initiation under long-term vibration.
Perfect Dynamic Balance Base: The hub serves as the datum for impeller dynamic balancing. We provide hubs with high precision regarding end-face runout and radial runout, offering a perfect reference surface for subsequent impeller balancing, thereby ensuring smooth machine operation and reducing bearing wear.
As a Key Connection Part, this impeller hub is widely used in:
Mining Drill Rig Cooling Systems: For connecting hydraulic oil cooler fans or engine cooling fans.
Torque Converter Assemblies: Serving as the core support base for pump wheels or turbines.
Construction Machinery Water Pumps: Connecting the fan pulley to the water pump impeller.
Large Ventilation Equipment: Used for impeller installation in mine ventilation fans or dust removal fans.
Clean Mating Surfaces: Thoroughly clean the hub bore and shaft journal before installation to ensure no oil, burrs, or foreign objects are present, preventing insufficient interference fit.
Thermal Installation: For interference-fit hubs, it is recommended to use an electromagnetic induction heater or oil bath heating for installation. Direct forceful hammering is strictly prohibited to avoid damaging the internal microstructure or causing hub deformation.
Bolt Tightening: When installing impeller bolts, a torque wrench must be used, and fastening must be performed in a diagonal, criss-cross sequence in stages to ensure uniform preload.
FEED BEAM
ROCK DRILL PARTS
AIR COMPRESSOR
PUMP
DTH DRILLING TOOLS
TOP HAMMER
PDC DRILL BITS
EXPLORATION (CORE DRILLING TOOLS)
ROTARY DRILLING TOOLS
RAISE DRILLING TOOLS
GEOTECHNICAL ENGINEERING TECHNOLOGY
HAND TOOLS
Customized Packaging Solutions:
All products are protected with heavy-duty, shock-resistant packaging (including wooden crates, steel frames, and anti-corrosion wrapping) to ensure safe arrival even under long-distance and harsh transport conditions.
Flexible & Global Logistics:
We support multiple shipping methods, including sea freight, air freight, and rail transport, and offer flexible terms such as FOB, CIF, and DAP to meet your delivery schedule and cost requirements.
Fast Lead Times & Order Support:
With a large inventory of standard parts and efficient production scheduling, we can respond quickly to urgent orders while maintaining consistent quality.
After-Sales & Technical Support:
Our dedicated team provides professional technical consultation, installation guidance, and after-sales service to help you maximize equipment performance and minimize downtime.
We have products, such as:
| 3217998510 | DIRECTION VALVE |
| 9106973960 | CONTROLLER,ROTARY PROP. |
| 2650349810 | TEE ADP |
| 9106972243 | JOYSTICK |
| 2657146045 | ENCODER, OPTICAL SHAFT |
| 5580002338 | FILTER |
| 2657646127 | CARRIAGE,SHEAVEASSEMBLY |
| 5580004898 | CRADLE |
| 2658607696 | MOTOR,M7,KEYED |
| 303-7504 | Steering wheel |
| 6J-1144 | BEARING |
| 6E-3524 | pump |
| 454-0277 | Stopper |
| 541-8043 | Cylinder |
| 9M-1328 | BEARING |
| 307-7342 | Final drive assembly |
| 9W4493 | blade |
| 2459951 | track roller |
| 1926445 | hydraulic cylinder |
| 001021-004 | Bushing |
| 001022-001 | Shaft |
| 001110-008 | Seal oil |
| 007947-054 | KIT SEAL |
| 013487-001 | Valve |
| 022893-001 | SWITCH, TEMPERATURE |
| 034562-051 | O-RING ADJUSTING SCREW |
| 007947-073 | sw comp oil filter bypass 30 psi |
| 001479-058 | GAUGE |
| 001022-056 | YOKE, Shaft |
| Q:What is your terms of packing? |
| A:Generally, we pack our goods in neutral white boxes and brown cartons. If you have legaly registered patent ,we can pack the goods inyour branded boxes after getting your authorization letters. |
| Q:What is your terms of payment? |
| A: T/T 30% as deposit, and 70% before delivery. We will show you the photos of the products and packages before you pay the balance. |
Q: What is your terms of delivery? |
| A: EXW, FOB, CFR, CIF, DDU, FCA. |
| Q:How about your delivery time? |
| A: Generally. it wlltake 5 to 12 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. |
Q:Can you guarantee that the goods are original? |
| A:Yes, we fully guarantee that the goods are original and you can inspect them carefully when they arrive at your address. |
| Q:Do you test all your goods before delivery? |
| A:Yes, we have 100% test before delivery. |
| Q:How do you make our business long-term and good relationship? |
1. We keep good quality and competitive price to ensure our customers benefit ; 2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from. |




